Shandong Shengxing Geotechnical Materials Co., Ltd. was established in 2019. The company mainly produces geotextiles, geomembranes, grass proof fabrics, cement blankets and other geotechnical products. The company has more than 80 geotextile production lines, more than 500 employees, and an annual turnover of 150 million yuan. The company has a 50 person R&D team and a 30 person testing center to ensure that every product leaving the factory has undergone qualified testing and meets the entry standards. At the same time, the company has passed the ISO9001 quality testing standard. The geotechnical materials produced by the company are exported to multiple countries and regions in Southeast Asia, Central Asia, Africa, etc. We have established long-term partnerships with 20000 material suppliers worldwide and welcome new and old customers from all over the world to visit and guide us.
WELCOME TO SHENGXING
The company is located in Dezhou City, Shandong Province
Geomembrane
FEATURED PROJECT CASE STUDIES
Our company has a construction and installation team that can provide on-site engineering design, construction and after-sales service for customers

Case description of geomembrane construction
The anti-seepage project of large water storage tanks adopts HDPE geomembrane construction, with a membrane thickness of 1.5mm and a width of 6m. Before construction, the base should be leveled and sharp debris removed. Then, the geomembrane should be mechanically laid to ensure that the membrane surface is flat and free of wrinkles. The lap width should be controlled at 10-15 cm. The hot melt welding process is adopted. After welding, it is tested by inflation, and the sealing performance of the weld seam meets the standard at 100%. After the completion of the project, the anti-seepage effect of the reservoir was excellent. After the rainy season test, there was no leakage and it passed the acceptance smoothly.

Geotextile construction case
For the reinforcement project of the expressway subgrade, 200g/㎡ polyester filament geotextile is selected. Before construction, the crushed stones and weeds on the surface of the subgrade are cleared first. Then, the geotextile is manually spread to ensure that the surface is flat and free of distortion. The lap width between the widths is no less than 30cm, and it is fixed by sewing process. After completion, settlement observations were conducted, and the stability of the roadbed was significantly improved, successfully passing the quality inspection before opening to traffic.